Potential Project
Components
Jamestown Public School has convened a Citizen's Advisory Committee to evaluate the District's facilities. The goal is to provide up-to-date environments that will support our educational goals. The committee also recommends improving safety, security, handicap accessibility and systems at the end of their useful life.
Educational Adequacy
New Maker Spaces indicated in green.
Site Safety Improvements
Car circulation indicated in yellow. Bus circulation indicated in red.
Existing Facility Improvements
- Window Replacement
- Controlled, Secure Entry
- ADA Restrooms
- Boiler Replacement
- Ventilation, Cooling, Temperature Control
- Energy Efficiency
- Emergency Egress Lighting
- Fire Alarm System
- Asbestos Abatement
Southeast Maker Space
- New wall finish, graphics, and display space creates excitement for the school's Creative Center (Maker / Music / Library)
- Tackable Wall Panels provide project display space and increase sound absorption
- Built-in Project Storage provides ample space for supplies and a wide range of projects / curriculum
Northwest Maker / Breakout Space
4. Flexible Furniture and Mobile Storage allow classes to quickly and easily adapt to a variety of group sizes and project types.
5. Projection for digital lessons and project presentations
Three Voting Options for Jamestown
Public School District Citizens
SEPTEMBER 25, 2018 BOND VOTE
For questions related to the bond, please refer to our "Referendum 2018" page on the District website
Quick Links
Upcoming Events
This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.